PENNSYLVANIA DEPARTMENT OF TRANSPORTATION
Total received in grants · trailing 12 months
$322M
$2for every U.S. household÷ 131M U.S. households
In perspective
0.2%of all $162.9B in tracked grants
55separate grants, trailing 12 months
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION has received $322M across 55 federal grants of $1M or more on record.
Data as of July 24, 2026. Source: USAspending.gov, prime contract awards $1M+. Federal spending data lags and has known gaps. This is not a real-time or complete record.
Grants by agency
Where this recipient’s grant dollars come from.
All grant awards
Swipe to see description and amount →
| Agency | Description | Amount |
|---|---|---|
| Department of Transportation | PROJECT TITLE: I-376, CHURCHILL TO MONROEVILLE :::: PROJECT DESCRIPTION: MILL AND OVERLAY WITH SEVERAL BRIDGE REHAB/PRESERVATIONS ON SR 376 FROM CHURCHILL INTERCHANGE TO MONROEVILLE INTERCHANGE IN WILKINS TOWNSHIP, PENN HILLS TOWNSHIP, CHURCHILL BOROUGH, AND MONROEVILLE BOROUGH, ALLEGHENY COUNTY. | $85,315,961 |
| Department of Transportation | PROJECT TITLE: I-376, EDGEWOOD TO CHURCHILL :::: PROJECT DESCRIPTION: MILL AND OVERLAY AND BRIDGE WORK ON I-376, FROM EDGEWOOD TO CHURCHILL IN EDGEWOOD, CHURCHILL AND WILKINSBURG BOROUGHS, ALLEGHENY COUNTY. THIS IS A PARTIAL DESIGN BUILD ROADWAY PROJECT. DESIGN ACTIVITIES ARE LIMITED TO: TRAFFIC CONTROL PLAN AND ADA CURB RAMPS. FOR THE ASPHALT MILLING AND RESURFACING, BRIDGE PRESERVATION, DRAINAGE, GUIDE RAIL, MEDIAN BARRIER, TRAFFIC SIGNALS, SIGNING, PAVEMENT MARKINGS, AND OTHER MISCELLANEOUS CONSTRUCTION, ALL WITHIN A LENGTH OF 22,578.13 LINEAR FEET (4.23 MILES), AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE FOR STATE ROUTE 376, IN ALLEGHENY COUNTY, CITY OF PITTSBURGH, BRADDOCK HILLS BOROUGH, CHURCHILL BOROUGH, EDGEWOOD BOROUGH, SWISSVALE BOROUGH, AND WILKINSBURG BOROUGH, COMMONWEALTH OF PENNSYLVANIA. | $34,517,000 |
| Department of Transportation | PROJECT TITLE: I-80 FROM CREEK ROAD TO SR 487 :::: PROJECT DESCRIPTION: I-80 FROM CREEK ROAD TO SR 487(SEGMENT 2325/2149 - 2405/1110), HEMLOCK, MT PLEASANT, SCOTT, SOUTH CENTRE TOWNSHIPS, AND THE TOWN OF BLOOMSBURG ROADWAY RECONSTRUCTION, BRIDGE REPLACEMENT AND PRESERVATION. | $20,897,648 |
| Department of Transportation | PROJECT TITLE: I-476 ADVANCE TRAVEL MANAGEMENT :::: PROJECT DESCRIPTION: I-476 ADVANCE TRAVEL MANAGEMENT DELAWARE COUNTY ACTIVE TRAVEL MANAGEMENT THIS PROJECT IS FOR CONSTRUCTION OF VARIABLE SPEED LIMIT SIGNS, QUEUE DETECTION, ITS DEVICES AND OTHER MISCELLANEOUS CONSTRUCTION, AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE FOR STATE ROUTE 0476 SECTION ATC, IN DELAWARE COUNTY RIDLEY, MARPLE, NETHER PROVIDENCE, SPRINGFIELD, RADNOR AND HAVERFORD TOWNSHIPS AND IN MONTGOMERY COUNTY LOWER MERION TOWNSHIP FROM APPROXIMATELY THE I-95 INTERCHANGE AT SEGMENT 0002 OFFSET 0363 AND SEGMENT 0003 OFFSET 0371 TO APPROXIMATELY 2000' NORTH OF THE COUNTY LINE ROAD OVERPASS AT SEGMENT 0144 OFFSET 0168 AND SEGMENT 0145 OFFSET 0186. | $13,189,800 |
| Department of Transportation | PROJECT TITLE: SR 11 OVER SR 2037, SUSQUEHANNA RIVER AND RAILROAD :::: PROJECT DESCRIPTION: BRIDGE IMPROVEMENTS ON STATE ROUTE 11 (EXETER AVENUE) OVER STATE ROUTE 2037, SUSQUEHANNA RIVER AND RAILROAD IN WEST PITTSTON BOROUGH, LUZERNE COUNTY. | $11,745,794 |
| Department of Transportation | PROJECT TITLE: I-79, NEVILLE ISLAND TO I-279 :::: PROJECT DESCRIPTION: MILL AND OVERLAY, BRIDGE REHABILITATION AND BRIDGE PRESERVATION ON I-79, FROM NEVILLE ISLAND TO I-279 IN ALEPPO TOWNSHIP AND GLENFIELD, SEWICKLEY HILLS AND FRANKLIN PARK BOROS, ALLEGHENY COUNTY. | $11,180,406 |
| Department of Transportation | PROJECT TITLE: WEST SHORE BYPASS - PHASE 1 :::: PROJECT DESCRIPTION: WEST SHORE BYPASS FROM BUTTONWOOD STREET OVERPASS IN WEST READING TO SCHUYLKILL RIVER BRIDGE EAST OF I-176 IN EXETER TOWNSHIP. HIGHWAY RECONSTRUCTION WITH RAMP RECONFIGURATION, BRIDGE REPLACEMENTS AND PREVENTATIVE MAINTENANCE ACTIVITIES. | $8,684,339 |
| Department of Transportation | PROJECT TITLE: INTERSTATE 80 MM 155 TO MM 159 :::: PROJECT DESCRIPTION: THE DESCRIPTION AND LOCATION OF THE PROJECT IS AS FOLLOWS: FOR THE IMPROVEMENT OF A CERTAIN SECTION OF STATE HIGHWAY IN CENTRE COUNTY, BOGGS & SNOW SHOE TOWNSHIPS, COMMONWEALTH OF PENNSYLVANIA, STATE ROUTE 0080, SECTION B43. THIS PROJECT BEING SITUATED ON STATE ROUTE 0080 FROM SEGMENT 1480 OFFSET 0000 EASTBOUND AND SEGMENT 1465 OFFSET 1478 WESTBOUND TO SEGMENT 1584 OFFSET 0503 EASTBOUND AND SEGMENT 1585 OFFSET 0675 WESTBOUND. FOR THE IMPROVEMENT OF APPROXIMATELY 11.68 MILES OF EXISTING SEPARATED LIMITED ACCESS HIGHWAY INVOLVING MILLING OF ASPHALT PAVEMENT, SUPERPAVE ASPHALT MIXTURE DESIGNS FOR BASE, BINDER AND WEARING COURSES, PRESERVATION WORK TO 4 EXISTING BRIDGES AND 1 CMS SIGN, CONSTRUCTION OF 2 NEW CMS SIGNS, VARIOUS ITS DEVICES, GUIDE RAIL UPGRADES, PAVEMENT MARKINGS, AND MISCELLANEOUS CONSTRUCTION AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE. BRIDGE KEY 43012 RURAL INTERSTATE, STATE OWNED SR 0080 (INTERSTATE 80 WESTBOUND) OVER SEDA-COG, N&B E, AND SR 0150 BOGGS TOWNSHIP, CENTRE COUNTY BRIDGE PRESERVATION BRIDGE KEY 43013 RURAL INTERSTATE, STATE OWNED SR 0080 (INTERSTATE 80 WESTBOUND) OVER BALD EAGLE CREEK BOGGS TOWNSHIP, CENTRE COUNTY BRIDGE PRESERVATION BRIDGE KEY 43353 RURAL INTERSTATE, STATE OWNED SR 0080 (INTERSTATE 80 EASTBOUND) OVER SEDA-COG, N&B E, AND SR 0150 BOGGS TOWNSHIP, CENTRE COUNTY BRIDGE PRESERVATION BRIDGE KEY 43354 RURAL INTERSTATE, STATE OWNED SR 0080 (INTERSTATE 80 EASTBOUND) OVER BALD EAGLE CREEK BOGGS TOWNSHIP, CENTRE COUNTY BRIDGE PRESERVATION | $8,430,120 |
| Department of Transportation | PROJECT TITLE: SR 27 OVER PINE CREEK - BRIDGE SEDIMENT REMOVAL :::: PROJECT DESCRIPTION: THIS PROJECT IS THE PARTIAL DESIGN AND CONSTRUCTION OF BRIDGE PROTECTION MEASURES AT 25 LOCATIONS THROUGHOUT CRAWFORD, ERIE, FOREST, MERCER, VENANGO, AND WARREN COUNTIES AS INDICATED ON THE CONCEPTUAL AND APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE. THESE MEASURES WILL REDUCE SCOUR AND IMPROVE THE RESILIENCY OF THE TRANSPORTATION NETWORK IN NORTHWESTERN PENNSYLVANIA. | $8,101,500 |
| Department of Transportation | PROJECT TITLE: MAJOR BRIDGE P3 PACKAGE 1 :::: PROJECT DESCRIPTION: THE MAJOR BRIDGE PUBLIC-PRIVATE PARTNERSHIP (MBP3) PACKAGE 1 PROJECT WILL DESIGN, BUILD, FINANCE, AND MAINTAIN THE PROJECTS BELOW. THIS PROJECT ACCOUNTS FOR THE REPAYMENT TO THE DEVELOPMENT ENTITY FOR THE DBFM PROJECT AGREEMENT THROUGH AVAILABILITY PAYMENTS OVER A 35-YEAR PERIOD, A ONETIME MOBILIZATION PAYMENT IN 2023 AND A ONETIME MILESTONE PAYMENT IN 2027. 1. MPMS# 75917: I-81 N TIER SUSQUEHANNA BRIDGE 2. MPMS# 111769: I-80 NESCOPECK BRIDGE 3. MPMS# 97274: I-78 LENHARTSVILLE BRIDGE 4. MPMS# 99552: I-80 WHITE HAVEN LEHIGH RIVER BRIDGE 5. MPMS# 90021: I-80 CANOE CREEK BRIDGE 6. MPMS# 106275: I-80 NORTH FORK BRIDGE | $7,310,896 |
| Department of Transportation | PROJECT TITLE: KARNS CROSSING BRIDGE :::: PROJECT DESCRIPTION: THIS PROJECT INVOLVES THE INTERSECTION IMPROVEMENTS AND REPLACEMENT OF THE 12-SPAN KARNS CROSSING BRIDGE WHICH SPANS OVER THE BESSEMER & LAKE ERIE RAILROAD AND THE BUFFALO & PITTSBURGH RAILROAD AS WELL AS REPLACEMENT OF THE TWIN-CELL ARCH CULVERT AND OTHER MISCELLANEOUS CONSTRUCTION, AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE FOR STATE ROUTE 0068, SECTION 253, IN BUTLER COUNTY BUTLER AND SUMMIT TOWNSHIPS FROM APPROXIMATELY 1200 FEET FROM THE START OF THE EXISTING BRIDGE AT SEGMENT 0500 OFFSET 0138 TO APPROXIMATELY 500 FEET FROM THE END OF THE EXISTING BRIDGE AT SEGMENT 0520 OFFSET 0224. | $7,013,246 |
| Department of Transportation | PROJECT TITLE: US 30 IMPROVEMENTS :::: PROJECT DESCRIPTION: THIS PROJECT CONSISTS OF SUPERPAVE OVERLAY, MILLING, BASE REPLACEMENT, ADA UPDATES, PAVEMENT MARKINGS, SIGNAL UPGRADES, INTERSECTION IMPROVEMENTS, AND OTHER MISCELLANEOUS CONSTRUCTION, ALL AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE FOR STATE ROUTE 0030, SECTION 113, IN LANCASTER COUNTY, SALISBURY, PARADISE, LEACOCK, & EAST LAMPETER TOWNSHIPS, FROM SEGMENT 0380 OFFSET 2265 TO SEGMENT 0571 OFFSET 1514, FOR AN OVERALL PROJECT LENGTH OF 47,967 LINEAR FEET (9.08 MILES). | $5,602,300 |
| Department of Transportation | PROJECT TITLE: SR 4005 MACK PARK BRIDGE SR 4030 CARTER AVENUE BRIDGE :::: PROJECT DESCRIPTION: FOR THE BRIDGE REPLACEMENT OF THE EXISTING STRUCTURE CARRYING SR 4030 (CARTER AVENUE) OVER MARSH RUN IN INDIANA BOROUGH STARTING AT SEGMENT 0020 OFFSET 0000 TO APPROXIMATELY 0020 SEGMENT 0550 OFFSET AND THE BRIDGE REPLACEMENT OF THE EXISTING STRUCTURE CARRYING SR 4005 (WAYNE AVENUE) OVER MARSH RUN STARTING AT SEGMENT 0060 OFFSET 0861 TO APPROXIMATELY 0070 SEGMENT 0258 OFFSET IN WHITE TOWNSHIP. | $5,262,121 |
| Department of Transportation | PROJECT TITLE: KARNS CROSSING BRIDGE :::: PROJECT DESCRIPTION: THIS PROJECT INVOLVES THE INTERSECTION IMPROVEMENTS AND REPLACEMENT OF THE 12-SPAN KARNS CROSSING BRIDGE WHICH SPANS OVER THE BESSEMER & LAKE ERIE RAILROAD AND THE BUFFALO & PITTSBURGH RAILROAD AS WELL AS REPLACEMENT OF THE TWIN-CELL ARCH CULVERT AND OTHER MISCELLANEOUS CONSTRUCTION, AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE FOR STATE ROUTE 0068, SECTION 253, IN BUTLER COUNTY BUTLER AND SUMMIT TOWNSHIPS FROM APPROXIMATELY 1200 FEET FROM THE START OF THE EXISTING BRIDGE AT SEGMENT 0500 OFFSET 0138 TO APPROXIMATELY 500 FEET FROM THE END OF THE EXISTING BRIDGE AT SEGMENT 0520 OFFSET 0224. | $5,243,734 |
| Department of Transportation | PROJECT TITLE: 5TH ST SAFETY: SPRING GARDEN ST TO ERIE AVE :::: PROJECT DESCRIPTION: TRAFFIC SIGNAL EQUIPMENT REPLACEMENT AND OTHER MISCELLANEOUS CONSTRUCTION, AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE FOR STATE ROUTE 0000, SECTION SIP (N 5TH STREET) IN PHILADELPHIA COUNTY FROM SPRING GARDEN STREET (SR 2006) TO ERIE AVENUE (SR 1004). THE 5TH STREET CORRIDOR FROM SPRING GARDEN STREET TO HUNTING PARK AVENUE STRETCHES APPROXIMATELY 3.75 MILES IN PHILADELPHIA. 5TH STREET IS A TWO-LANE ROADWAY WITH PARKING ON BOTH SIDES OF THE ROAD WITHIN THESE LIMITS. 5TH STREET IS ONE-WAY NORTHBOUND BETWEEN SPRING GARDEN STREET AND RISING SUN AVENUE. 5TH STREET CHANGES TO TWO-WAY AT RISING SUN, AND CONTINUES AS A TWO-WAY STREET TO HUNTING PARK AVENUE. THE CORRIDOR IS CHARACTERIZED BY A HIGH FREQUENCY OF SIGNALIZED AND STOP-CONTROLLED INTERSECTIONS. THE INTERSECTIONS ALONG THE CORRIDOR ARE CHARACTERIZED BY PEDESTAL MOUNTED SIGNALS. THERE WERE 292 REPORTABLE CRASHES OVER THE PAST FIVE YEARS. WITHIN THE FIVE-YEAR PERIOD OF JANUARY 1, 2013 TO DECEMBER 31, 2017, 125 OF THE 292 REPORTABLE CRASHES (43%) WERE ANGLE CRASHES AND 51 OF THE 292 REPORTABLE CRASHES (17%) WERE VEHICLE-PEDESTRIAN CRASHES.THE COUNTERMEASURES PROPOSED AS PART OF THIS PROJECT INCLUDE:· CONVERT ALL SIGNALS FROM PEDESTAL TO MAST ARM FROM SPRING GARDEN STREET TO LYCOMING STREET· INSTALL PEDESTRIAN COUNTDOWN TIMER SIGNAL HEADS FROM SPRING GARDEN STREET TO LYCOMING STREETTHESE COUNTERMEASURES WILL TARGET THE HIGH FREQUENCY OF ANGLE AND PEDESTRIAN CRASHES ALONG THE CORRIDOR, ULTIMATELY REDUCING FATAL AND INJURY CRASHES. | $5,009,666 |
| Department of Transportation | PROJECT TITLE: CHURCH RD:GREENWD-RICE'S :::: PROJECT DESCRIPTION: CHURCH ROAD: GREENWOOD AVENUE - RICE'S MILL ROAD THIS PROJECT INVOLVES THE ADDITION OF TURN LANES AT THE INTERSECTIONS OF PA 73 (CHURCH ROAD) AND GREENWOOD AVENUE. LEFT TURN LANES WILL BE ADDED ON CHURCH ROAD AND A NORTHBOUND RIGHT TURN LANE WILL BE ADDED ON GREENWOOD AVENUE. THE TRAFFIC SIGNALS ON PA 73 AT GREENWOOD AVENUE AND RICE'S MILL ROAD WILL BE INTERCONNECTED. DRAINAGE IN THE AREA WILL BE IMPROVED AND A NEW STORMWATER MANAGEMENT SYSTEM WILL BE INSTALLED. THE EXISTING SIDEWALK ON THE EAST SIDE OF GREENWOOD GOING NORTH FROM THE INTERSECTION WITH CHURCH ROAD WILL BE MAINTAINED. ADDITIONAL SIDEWALK WILL BE ADDED ALONG THE NORTH SIDE OF CHURCH ROAD FROM RICE’S MILL ROAD TO GREENWOOD AVENUE, ALL AS INDICATED ON THE DRAWINGS APPROVED FOR STATE ROUTE 0073, SECTION 04N, IN MONTGOMERY COUNTY CHELTENHAM TOWNSHIP FROM APPROXIMATELY 237’ WEST OF RICES MILL ROAD AT SEGMENT 0610 OFFSET 1439 TO APPROXIMATELY TO 864’ EAST OF SR 2054/GREENWOOD AVENUE AT SEGMENT 0620 OFFSET 0868. | $4,952,782 |
| Department of Transportation | PROJECT TITLE: 5TH ST SAFETY: SPRING GARDEN ST TO ERIE AVE :::: PROJECT DESCRIPTION: TRAFFIC SIGNAL EQUIPMENT REPLACEMENT AND OTHER MISCELLANEOUS CONSTRUCTION, AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE FOR STATE ROUTE 0000, SECTION SIP (N 5TH STREET) IN PHILADELPHIA COUNTY FROM SPRING GARDEN STREET (SR 2006) TO ERIE AVENUE (SR 1004). THE 5TH STREET CORRIDOR FROM SPRING GARDEN STREET TO HUNTING PARK AVENUE STRETCHES APPROXIMATELY 3.75 MILES IN PHILADELPHIA. 5TH STREET IS A TWO-LANE ROADWAY WITH PARKING ON BOTH SIDES OF THE ROAD WITHIN THESE LIMITS. 5TH STREET IS ONE-WAY NORTHBOUND BETWEEN SPRING GARDEN STREET AND RISING SUN AVENUE. 5TH STREET CHANGES TO TWO-WAY AT RISING SUN, AND CONTINUES AS A TWO-WAY STREET TO HUNTING PARK AVENUE. THE CORRIDOR IS CHARACTERIZED BY A HIGH FREQUENCY OF SIGNALIZED AND STOP-CONTROLLED INTERSECTIONS. THE INTERSECTIONS ALONG THE CORRIDOR ARE CHARACTERIZED BY PEDESTAL MOUNTED SIGNALS. THERE WERE 292 REPORTABLE CRASHES OVER THE PAST FIVE YEARS. WITHIN THE FIVE-YEAR PERIOD OF JANUARY 1, 2013 TO DECEMBER 31, 2017, 125 OF THE 292 REPORTABLE CRASHES (43%) WERE ANGLE CRASHES AND 51 OF THE 292 REPORTABLE CRASHES (17%) WERE VEHICLE-PEDESTRIAN CRASHES.THE COUNTERMEASURES PROPOSED AS PART OF THIS PROJECT INCLUDE:· CONVERT ALL SIGNALS FROM PEDESTAL TO MAST ARM FROM SPRING GARDEN STREET TO LYCOMING STREET· INSTALL PEDESTRIAN COUNTDOWN TIMER SIGNAL HEADS FROM SPRING GARDEN STREET TO LYCOMING STREETTHESE COUNTERMEASURES WILL TARGET THE HIGH FREQUENCY OF ANGLE AND PEDESTRIAN CRASHES ALONG THE CORRIDOR, ULTIMATELY REDUCING FATAL AND INJURY CRASHES. | $4,705,781 |
| Department of Transportation | PROJECT TITLE: SR 50 SIGNAL UPGRADES :::: PROJECT DESCRIPTION: SIGNAL UPGRADES TO SR 0050 IN BRIDGEVILLE, HEIDELBERG AND CARNEGIE BOROUGHS AND COLLIER TOWNSHIP, ALLEGHENY COUNTY. THE DESCRIPTION AND LOCATION OF THE PROJECT IS AS FOLLOWS: THIS IS A PARTIAL DESIGN BUILD ROADWAY PROJECT. DESIGN ACTIVITIES ARE LIMITED TO: CONCRETE CURB RAMPS. FOR THE TRAFFIC SIGNALS, CURB AND SIDEWALK, SIGNING AND PAVEMENT MARKINGS, AND OTHER MISCELLANEOUS CONSTRUCTION. ALL WITHIN A LENGTH OF 51,626.00 LINEAR FEET (9.774 MILES) AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE FOR STATE ROUTE 0050, SECTION A38 IN ALLEGHENY, BEAVER, AND LAWRENCE COUNTIES, VARIOUS MUNICIPALITIES, COMMONWEALTH OF PENNSYLVANIA. THIS PROJECT BEING SITUATED AS FOLLOWS: VARIOUS STATE AND LOCAL ROUTES RANGING FROM A POINT APPROXIMATELY AT SR 0050, SEGMENT 0130, OFFSET 0784 (STATION 0+00) TO A POINT APPROXIMATELY AT SR 1005, SEGMENT 0030, OFFSET 0433 (STATION 13+50). | $4,687,973 |
| Department of Transportation | PROJECT TITLE: I-80 FROM CREEK ROAD TO SR 487 :::: PROJECT DESCRIPTION: I-80 FROM CREEK ROAD TO SR 487(SEGMENT 2325/2149 - 2405/1110), HEMLOCK, MT PLEASANT, SCOTT, SOUTH CENTRE TOWNSHIPS, AND THE TOWN OF BLOOMSBURG ROADWAY RECONSTRUCTION, BRIDGE REPLACEMENT AND PRESERVATION. | $4,000,000 |
| Department of Transportation | PROJECT TITLE: PA 28 CLARION LINE-SNYDER :::: PROJECT DESCRIPTION: THIS PROJECT CONSISTS OF RESURFACING TO INCLUDE MILLING OF THE EXISTING BITUMINOUS WEARING COURSES, BITUMINOUS PATCHING, PAVING, LEVELING, BINDER AND WEARING COURSES AS WELL AS MINOR DRAINAGE AND GUIDE RAIL UPGRADES AND OTHER MISCELLANEOUS CONSTRUCTION, AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE FOR STATE ROUTE 0028, SECTION 501, IN JEFFERSON AND CLARION COUNTY IN CLOVER, ROSE AND REDBANK TOWNSHIPS ALONG PA 28 STARTING APPROXIMATELY AT THE CLARION COUNTY LINE AT SEGMENT 0010 OFFSET 0000 TO APPROXIMATELY EAST OF TOWNSHIP ROAD #397 (SNYDER ROAD) AT SEGMENT 0180 OFFSET 0250. | $3,613,730 |
| Department of Transportation | PROJECT TITLE: ENV REV PA DEP :::: PROJECT DESCRIPTION: STATEWIDE FUNDING FOR ENVIRONMENTAL REVIEW FROM PA DEPARTMENT OF ENVIRONMENTAL PROTECTION. | $3,367,069 |
| Department of Transportation | PROJECT TITLE: US 6: SHEFFIELD RESURFACING :::: PROJECT DESCRIPTION: US ROUTE 6 (GRAND ARMY OF THE REPUBLIC HIGHWAY/MAIN STREET) FROM SEGMENT/OFFSET 0850/0000 TO SEGMENT/OFFSET 0900/0000 SHEFFIELD TOWNSHIP, WARREN COUNTY RESURFACING STATE ROUTE 666 (DAVID ZEISBERGER HIGHWAY) FROM STATE ROUTE 948 (BROOKSTON ROAD) TO US ROUTE 6 (MAIN STREET) SHEFFIELD TOWNSHIP, WARREN COUNTY RESURFACING THIS PROJECT IS THE CONSTRUCTION OF APPROXIMATELY 2.40 MILES FROM SR 0006 SEGMENT 0840/OFFSET 1585 TO SR 0006 SEGMENT 0900/OFFSET 0100, AND APPROXIMATELY 2.31 MILES FROM SR 0666 SEGMENT 0110/OFFSET 0000 TO SR 0666 SEGMENT 0150/OFFSET 1331, AND APPROXIMATELY 0.64 MILES FROM SR 2004 SEGMENT 0010/OFFSET 0000 TO SR 2004 SEGMENT 0010/OFFSET 3424, INCLUDING FLEXIBLE BASE REPLACEMENT, OVERLAYS WITH SUPERPAVE ASPHALT MIXTURES, BRIDGE DECK REPAIRS WITH CONCRETE OVERLAYS, TREE TRIMMING, ADA SIDEWALK UPDATES, CURB REPLACEMENT, DRAINAGE UPDATES, GUIDERAIL, DELINEATORS, AND PAVEMENT MARKINGS, AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE FOR STATE ROUTE 0006, SECTION 33M AND STATE ROUTE 0666, SECTION 03M AND STATE ROUTE 2004, SECTION 01M, IN SHEFFIELD TOWNSHIP, WARREN COUNTY. | $3,214,786 |
| Department of Transportation | PROJECT TITLE: ST COLLEGE SHARED USE PATH, TASA :::: PROJECT DESCRIPTION: THE DESCRIPTION AND LOCATION OF THE PROJECT IS AS FOLLOWS: FOR THE CONSTRUCTION OF SHARED-USE PATHWAYS IN CENTRE COUNTY, STATE COLLEGE BOROUGH, COMMONWEALTH OF PENNSYLVANIA. THE PROJECT BEING SITUATED AS FOLLOWS: MOSTLY ADJACENT TO EASTERLY & WESTERLY PARKWAY (SITE 1) AND BLUE COURSE DRIVE (SITE 2). THE PROJECT LENGTH IS APPROXIMATELY 8115 FEET (1.54 MILES). PATHWAY CONSTRUCTION INCLUDES: SUPERPAVE ASPHALT MIXTURE DESIGN FOR THE BASE REPLACEMENT, BINDER, AND WEARING COURSES, PIPING, INLETS, CONCRETE CURB, SIDEWALKS, DETECTABLE WARNING SURFACES, CONCRETE CHEEK WALLS, PAVEMENT MARKINGS, AND MISCELLANEOUS CONSTRUCTION AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE. | $2,891,930 |
| Department of Transportation | PROJECT TITLE: E PROSPECT RD IMPROVEMENT :::: PROJECT DESCRIPTION: THIS PROJECT CONSISTS OF INTERSECTION SAFETY IMPROVEMENTS AT EAST PROSPECT ROAD (SR 0124) AND FREYSVILLE ROAD (SR 2001). WORK IS ANTICIPATED TO INCLUDE THE CONSTRUCTION OF A NEW TRAFFIC SIGNAL AT THE INTERSECTION OF SR 0124 AND SR 2001, AND OTHER MISCELLANEOUS CONSTRUCTION, ALL AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE FOR STATE ROUTE 0124, SECTION 016, IN YORK COUNTY, WINDSOR TOWNSHIP, FROM JUST WEST OF THE INTERSECTION AT SEGMENT 0110 OFFSET 1860 TO JUST EAST OF INTERSECTION AT SEGMENT 0120 OFFSET 0900. THE YORK COUNTY INTERSECTION OF EAST PROSPECT (SR 0124) AND FREYSVILLE ROAD (SR 2001) WAS IDENTIFIED THROUGH THE HIGHWAY SAFETY NETWORK SCREENING AND HAS AN EXCESS YEARLY CRASH FREQUENCY OF 1.55 CRASHES PER YEAR. IT IS THE FOURTH HIGHEST CRASH EXCESS FOR YORK COUNTY INTERSECTIONS IN THE HSNS. | $2,831,889 |
| Department of Transportation | PROJECT TITLE: US 322 PAINT CREEK BRIDGE :::: PROJECT DESCRIPTION: THIS PROJECT IS THE BRIDGE REPLACEMENT OF THE EXISTING STRUCTURE A REINFORCED CONCRETE ARCH CARRYING SR 322 WITH A NEW SINGLE SPAN COMP. P/S CONC. PA BULB-TEE BEAM BRIDGE AND OTHER MISCELLANEOUS CONSTRUCTION, AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE FOR STATE ROUTE 322, SECTION 353, IN CLARION COUNTY ELK TOWNSHIP FROM APPROXIMATELY 1000 FEET FROM THE START OF THE EXISTING STRUCTURE AT SEGMENT 0220 OFFSET 0817 TO APPROXIMATELY 1000 FEET FROM THE END OF THE EXISTING STRUCTURE AT SEGMENT 0230 OFFSET 1098. BRIDGE KEY 10976 RURAL PRINCIPAL ARTERIAL, STATE OWNED SR 0322 OVER PAINT CREEK ELK TOWNSHIP, CLARION COUNTY BRIDGE REPLACEMENT | $2,570,148 |
| Department of Transportation | PROJECT TITLE: US 219 - MEYERSDALE TO BERLIN JOINTS :::: PROJECT DESCRIPTION: THIS PROJECT IS THE CONCRETE SLAB AND JOINT REPAIRS ON US 219 FROM THE MEYERSDALE EXIT TO THE BERLIN EXIT AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE FOR STATE ROUTE 0219, SECTION 059, IN SOMERSET COUNTY, BLACK, BROTHERSVALLEY, AND SUMMIT TOWNSHIPS FROM APPROXIMATELY SEGMENT 0194 OFFSET 0200 TO SEGMENT 0521 OFFSET 1100. | $2,544,968 |
| Department of Transportation | PROJECT TITLE: 25TH STREET TO SR 611 IN WILSONBORO/CITY OF EASTON :::: PROJECT DESCRIPTION: THIS PROJECT INCLUDES MILLING, OVERLAY (SCRATCH, WEARING COURSE), BASE REPAIR, MANUAL PATCHING, CURB RAMPS, PAVEMENT MARKINGS, AND OTHER MISCELLANEOUS CONSTRUCTION, AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE FOR STATE ROUTE 0248, SECTION 11M, IN NORTHAMPTON COUNTY, CITY OF EASTON, WILSON BOROUGH, PALMER TOWNSHIP FROM APPROXIMATELY SEGMENT 0490 OFFSET 2038 AT SR 2012 (25TH ST) TO SEGMENT 0570 OFFSET 1423 AT SR 611 (LARRY HOLMES DRIVE) AND SEGMENT 0491 OFFSET 2016 TO SEGMENT 0491 OFFSET 2769. | $2,301,551 |
| Department of Transportation | PROJECT TITLE: DISTRICT 10 HFST NORTHWEST 2026 :::: PROJECT DESCRIPTION: THIS PROJECT IS THE SAFETY IMPROVEMENT (HIGH FRICTION SURFACE TREATMENT) ALONG VARIOUS ROUTES IN VARIOUS MUNICIPALITIES IN ARMSTRONG, BUTLER, CLARION, JEFFERSON, AND INDIANA COUNTIES AND OTHER MISCELLANEOUS CONSTRUCTION, AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE FOR VARIOUS STATE ROUTES IN VARIOUS SECTIONS, IN VARIOUS COUNTIES INCLUDING ARMSTRONG, BUTLER, CLARION, JEFFERSON, AND INDIANA IN VARIOUS CITIES/BOROUGHS/TOWNSHIPS. | $2,272,000 |
| Department of Transportation | PROJECT TITLE: INTERSTATE GUIDE RAIL - DISTRICT 11 :::: PROJECT DESCRIPTION: UPGRADE EXISTING GUIDERAIL AND END TREATMENTS ON DISTRICT 11'S INTERSTATE SYSTEM BASED ON MANUAL FOR ASSESSING SAFETY HARDWARE (MASH) CRITERIA. | $2,217,185 |
| Department of Transportation | PROJECT TITLE: VENANGO SR 3021 SLIDE (GRP #1) :::: PROJECT DESCRIPTION: THIS PROJECT WILL CORRECT SLIDES IN VARIOUS COUNTIES IN THE NORTHWEST RURAL PLANNING ORGANIZATION'S SERVICE AREA, IMPROVING THE RESILIENCY OF THE TRANSPORTATION NETWORK IN NORTHWESTERN PENNSYLVANIA. | $2,069,760 |
| Department of Transportation | PROJECT TITLE: I-376, COMMERCIAL STREET BRIDGE :::: PROJECT DESCRIPTION: BRIDGE IMPROVEMENTS ON THE COMMERCIAL STREET BRIDGE AND 4 STRUCTURES AT THE BRADDOCK AVENUE INTERCHANGE IN THE CITY OF PITTSBURGH, ALLEGHENY COUNTY. | $2,031,541 |
| Department of Transportation | PROJECT TITLE: REHAB/PRESERV MM 165 TO 170 :::: PROJECT DESCRIPTION: THE DESCRIPTION AND LOCATION OF THE PROJECT IS AS FOLLOWS: FOR THE IMPROVEMENT OF A CERTAIN SECTION OF STATE HIGHWAY IN CENTRE & CLINTON COUNTY, MARION & PORTER TOWNSHIPS, COMMONWEALTH OF PENNSYLVANIA, STATE ROUTE 0080, SECTION B43. THIS PROJECT BEING SITUATED ON STATE ROUTE 0080 FROM SEGMENT 1640 OFFSET 1534 EASTBOUND AND SEGMENT 1645 OFFSET 1881 WESTBOUND TO SEGMENT 1706 OFFSET 0100 EASTBOUND AND SEGMENT 1707 OFFSET 0100 WESTBOUND. FOR THE IMPROVEMENT OF APPROXIMATELY 12.38 MILES OF EXISTING SEPARATED LIMITED ACCESS HIGHWAY INVOLVING MILLING OF ASPHALT PAVEMENT, SUPERPAVE ASPHALT MIXTURE DESIGNS FOR BASE, BINDER AND WEARING COURSES, VARIOUS ITS DEVICES, GUIDE RAIL UPGRADES, PAVEMENT MARKINGS, AND MISCELLANEOUS CONSTRUCTION AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE. | $2,000,000 |
| Department of Transportation | PROJECT TITLE: BRIDGE OVER BIG RUN :::: PROJECT DESCRIPTION: THE DESCRIPTION AND LOCATION OF THE PROJECT IS AS FOLLOWS: FOR THE IMPROVEMENT OF A CERTAIN SECTION OF STATE HIGHWAY IN ELK COUNTY, CITY OF ST MARYS, COMMONWEALTH OF PENNSYLVANIA, STATE ROUTE 0120, SECTION A08. THE PROJECT IS SITUATED AS FOLLOWS: ON STATE ROUTE 0120 AT SEGMENT 0420/OFFSET 1190 TO SEGMENT 0420/OFFSET 2399. FOR A CONSTRUCTION LENGTH OF APPROXIMATELY 1009.24 FEET (0.191 MILES). FOR THE REMOVAL OF A STRUCTURE AND CONSTRUCTION OF ITS REPLACEMENT, A PRECAST REINFORCED CONCRETE BOX CULVERT. CONSTRUCTION INCLUDES SUPERPAVE ASPHALT MIXTURE DESIGNS FOR THE BASE, BINDER, AND WEARING COURSES, GUIDE RAIL UPGRADES, DRAINAGE IMPROVEMENTS, PAVEMENT MARKINGS, AND MISCELLANEOUS CONSTRUCTION AS INDICATED ON THE APPROVED CONSTRUCTION DRAWINGS. BRIDGE KEY 15532 (URBAN MINOR ARTERIAL, 13 FEET) SR 0120 OVER BIG RUN ST MARYS CITY, ELK COUNTY BRIDGE REPLACEMENT | $1,926,210 |
| Department of Transportation | D12 SUPERSTRUCTURE 2017-2 | $1,791,354 |
| Department of Transportation | PROJECT TITLE: 309 & TILGHMAN I/C RECON :::: PROJECT DESCRIPTION: PA 309 FROM I-78 INTERCHANGE RAMPS/SOUTH WHITEHALL TOWNSHIP LINE TO US 22 INTERCHANGE RAMPS SOUTH WHITEHALL TOWNSHIP, LEHIGH COUNTY INTERCHANGE RECONFIGURATION WITH TWO BRIDGE REPLACEMENT AND COORDINATED SIGNAL SYSTEM | $1,644,698 |
| Department of Transportation | PROJECT TITLE: PA 28 GOHEENVILLE SOUTH PM :::: PROJECT DESCRIPTION: RESURFACING TO INCLUDE MILLING OF EXISTING ASPHALT WEARING COURSES, PATCHING, PAVING, LEVELING, BINDER AND WEARING COURSES AND MINOR DRAINAGE AND GUIDERAIL UPGRADES ALONG SR 28 FROM SOUTH FORK PINE CREEK TO 0.56 MILES NORTH OF THE INTERSECTION OF SR 1027 IN BOGGS AND VALLEY TOWNSHIPS, ARMSTRONG COUNTY. | $1,584,393 |
| Department of Transportation | PROJECT TITLE: OXFORD VALLY@LINCOLNHW :::: PROJECT DESCRIPTION: THIS PROJECT INVOLVES THE RECONSTRUCTION OF N. OXFORD VALLEY ROAD (SR 2029) AS IT APPROACHES THE LINCOLN HIGHWAY (SR 2037) INTERSECTION FROM THE NORTH AND SOUTH, IN FALLS AND MIDDLETOWN TOWNSHIPS, BUCKS COUNTY, PA. BRISTOL-OXFORD VALLEY ROAD (SR 2029) WILL BE RE-ALIGNED TO INTERSECT N. OXFORD VALLEY ROAD (SR 2053) TO FORM A NEW SIGNALIZED INTERSECTION ACROSS FROM THE OXFORD POINT SHOPPING CENTER. ADDITIONAL IMPROVEMENTS INCLUDE WIDENING AT THE SR 2037 AND SR 2029 INTERSECTION TO PROVIDE DOUBLE LEFT TURN LANES AT ALL FOUR APPROACHES, NEW TRAFFIC SIGNALS WITH UPDATED TIMINGS, SIDEWALK, DRAINAGE, AND ADA FACILITIES. | $1,580,000 |
| Department of Transportation | PROJECT TITLE: SR 4013 OVER ELK CREEK :::: PROJECT DESCRIPTION: THIS PROJECT IS THE SINGLE SPAN STRUCTURE REPLACEMENT OVER ELK CREEK INCLUDING ROADWAY RECONSTRUCTION, GUIDERAIL, SIGNING UPDATES, DRAINAGE UPDATES, ENVIRONMENTAL CONTROL, AND SEEDING, AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE FOR STATE ROUTE 4013, SECTION B01, IN MCKEAN TOWNSHIP, ERIE COUNTY FROM APPROXIMATELY SEGMENT 0080 OFFSET 0611 TO APPROXIMATELY SEGMENT 0070 OFFSET 1051. BRIDGE KEY 16380 RURAL MINOR COLLECTOR, STATE OWNED SR 4013 (DUNN VALLEY ROAD) OVER ELK CREEK MCKEAN TOWNSHIP, ERIE COUNTY BRIDGE REPLACEMENT | $1,532,765 |
| Department of Transportation | PROJECT TITLE: PA 271 MENOHER BOULEVARD ROCKFALL MESH :::: PROJECT DESCRIPTION: THIS PROJECT IS THE SLIDE REPAIR AND ROCKFALL MESH REPAIR ON PA 271 IN SOUTHMONT BOROUGH AND ROCKFALL FENCE REPAIR ON PA 403 IN UPPER YODER TOWNSHIP, CAMBRIA COUNTY. THESE CONSTRUCTION ACTIVITIES WILL HELP TO IMPROVE INFRASTRUCTURE RESILIENCE OF THE TRANSPORTATION FACILITY BY STABILIZING THE ROCKFALL SLOPE BY PLACEMENT OF NEW ROCKFALL MESH AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE FOR STATE ROUTE 0271, SECTION 027 FROM APPROXIMATELY SEGMENT 0170 OFFSET 0618 TO SEGMENT 0170 OFFSET 1594. | $1,520,006 |
| Department of Transportation | PROJECT TITLE: SR6 EAST OF WYALUSING :::: PROJECT DESCRIPTION: SR6 EAST OF WYALUSING WYALUSING TOWNSHIP SOIL SLIDE CORRECTION REPAIRING & UPGRADING EMBANKMENTS THE DESCRIPTION AND LOCATION OF THE PROJECT ARE AS FOLLOWS: PERMANENT STEEL SHEET PILING, FULL DEPTH RECLAMATION, PIPE REPLACEMENT, GUIDERAIL, AND OTHER MISCELLANEOUS CONSTRUCTION, AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE FOR STATE ROUTE 6, SECTION 196, IN BRADFORD COUNTY WYALUSING TOWNSHIP FROM APPROXIMATELY 3.4 MILES EAST OF THE INTERSECTION OF SR 6 AND SR 706 AT SEGMENT 1070 OFFSET 0282 TO APPROXIMATELY 3.8 MILES EAST OF THE INTERSECTION OF SR 6 AND SR 706 AT SEGMENT 1080 OFFSET 0961. | $1,500,000 |
| Department of Transportation | PROJECT TITLE: SRTP RIDESHARE PROGRAM :::: PROJECT DESCRIPTION: HARRISBURG MPO RIDESHARING, VANPOOLING PROGRAMS, AND TRANSIT COORDINATION | $1,496,045 |
| Department of Transportation | PROJECT TITLE: I-180 EAST AND WEST OVER LOYALSOCK CREEK :::: PROJECT DESCRIPTION: BRIDGE KEY 24640 URBAN INTERSTATE, STATE OWNED SR 0180 (INTERSTATE 180 EASTBOUND) OVER SR 8034, SR 2039, AND LOYALSOCK CREEK MONTOURSVILLE BOROUGH, LYCOMING COUNTY BRIDGE PRESERVATION BRIDGE KEY 24641 URBAN INTERSTATE, STATE OWNED SR 0180 (INTERSTATE 180 WESTBOUND) OVER SR 8034, SR 2039, AND LOYALSOCK CREEK MONTOURSVILLE BOROUGH, LYCOMING COUNTY BRIDGE PRESERVATION | $1,486,500 |
| Department of Transportation | CATASAQUA BORO LEHIGH COUNTY | $1,471,873 |
| Department of Transportation | PROJECT TITLE: PA AVENUE OVER DELAWARE CANAL :::: PROJECT DESCRIPTION: PENNSYLVANIA AVENUE OVER DELAWARE CANAL MORRISVILLE BORO BRIDGE REPLACEMENT | $1,452,000 |
| Department of Transportation | PROJECT TITLE: SR 1032 BRIDGE OVER SHIRLEY RUN (D.D.P.) :::: PROJECT DESCRIPTION: THIS IS A DIGITAL DELIVERY PILOT PROJECT FOR THE CONSTRUCTION OF APPROXIMATELY 0.083 MILE FROM SR 1032/SEGMENT 0090/OFFSET 1654 TO SR 1032/SEGMENT 0100/OFFSET 0335, INCLUDING A SINGLE 60' SPAN BRIDGE OVER SHIRLEY RUN, PAVING WITH SUPERPAVE ASPHALT MIXTURES, DRAINAGE, GUIDERAIL, SIGNING, DELINEATORS, AND PAVEMENT MARKINGS, AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE. | $1,442,007 |
| Department of Transportation | PROJECT TITLE: RIDGE PIKE (SCHOOL-BELVOIR) :::: PROJECT DESCRIPTION: RIDGE PIKE (SCHOOL LANE TO BELVOIR ROAD) SR 7046 OVER NORFOLK SOUTHERN NORRISTOWN BOROUGH BRIDGE REPLACEMENT | $1,395,800 |
| Department of Transportation | PROJECT TITLE: SR 487 OVER ABANDONED RR :::: PROJECT DESCRIPTION: THE PROJECT INVOLVES THE REMOVAL OF THE SR 487 BRIDGE OVER AN ABANDONED RAILROAD. THERE WILL BE APPROXIMATELY 325 FEET OF RECONSTRUCTION OVER THE ABANDONED RAILROAD AND A TOTAL OF 850 FEET OF MILL AND OVERLAY. IT IS ANTICIPATED THAT CONCRETE PAVEMENT FROM THE ADJACENT SR 80 RECONSTRUCTION PROJECT WILL BE USED AS THE PRIMARY FILL FOR THE EXISTING BRIDGE SPANS WITH ROCK FOR SLOPE STABILIZATION. EXCAVATION IS EXPECTED TO BE LIMITED TO CLEARING AND GRUBBING EXCEPT FOR THE REMOVAL OF TWO EXISTING PIPES UNDER THE ABANDONED RAILROAD BED (ONE EAST AND ONE WEST OF THE BRIDGE) WHICH WILL BE REPLACED BY DITCHES TO CONVEY THE FLOW FROM THE EXISTING UPSTREAM CHANNELS TO THE EXISTING DOWNSTREAM CHANNELS. GUIDE RAIL WILL BE REPLACED WHERE NECESSARY AND NEW SIGNING AND PAVEMENT MARKINGS WILL BE INSTALLED. TREES ALONG SAWMILL ROAD AND ALLIANCE PARK DRIVE WILL BE SELECTIVELY REMOVED TO IMPROVE INTERSECTION SIGHT DISTANCE. BRIDGE KEY 12589 URBAN MINOR ARTERIAL, STATE OWNED SR 0487 OVER ABANDONED RAILROAD SCOTT TOWNSHIP, COLUMBIA COUNTY BRIDGE REMOVAL (REPLACED WITH ROADWAY) | $1,392,000 |
| Department of Transportation | PROJECT TITLE: MANN'S NARROWS WALL/ROCK SLIDE :::: PROJECT DESCRIPTION: SR 322, SEG 211/770 TO 211/2000 BROWN TWP, MIFFLIN COUNTY ROADWAY & SLOPE STABILITY ROCK FALL HAZARD ON SR 1005 AND US ROUTE 0322. SR 1005 IS LOCATED ABOVE US 322. IN DECEMBER OF 2020 THERE WAS A SIGNIFICANT AMOUNT OF ROCK THAT FELL FROM THE CUT SLOPE ON SR 1005 THAT CLOSED SR 1005 FOR APPROXIMATELY TWO WEEKS. THE ROCK FROM THAT 2020 SR 1005 ROCKFALL ALSO REACHED US 322. ROCK CUT SLOPE ON US 322 ALSO CREATES A HAZARD FOR VEHICLES TRAVELING ON US 322. US ROUTE 0322 IS A VITAL CORRIDOR THAT CARRIES TRAFFIC TO THE STATE COLLEGE AREA FROM THE HARRISBURG AREA. THIS PROJECT AIMS TO PREVENT FUTURE ROCK SLIDES BY ENSURING SLOPE STABILITY, THEREBY INCREASING THE RESILIENCE OF THE HIGHLY-TRAVELLED SR 0322. | $1,358,000 |
| Department of Transportation | PROJECT TITLE: MAIN STREET SIDEWALK IMPR :::: PROJECT DESCRIPTION: THE PROJECT IS PLANNED ALONG THE SOUTH SIDE OF SR 0023 (E MAIN STREET), FROM SR 0772 (NEWPORT ROAD) TO MAPLE AVENUE, IN UPPER LEACOCK TOWNSHIP, LANCASTER COUNTY. THE PROJECT WILL IMPROVE PEDESTRIAN SYSTEM LINKAGES THROUGH CONSTRUCTION OF A NEW 5-FOOT WIDE SIDEWALK AND ADA RAMPS. THREE (3) STORMWATER INLETS WILL BE REPLACED AND TWO (2) WILL BE INSTALLED TO AUGMENT THE EXISTING STORMWATER FACILITIES; ASSOCIATED PIPE INSTALLATION/REPLACEMENT IS ANTICIPATED TO ACCOMMODATE THE INLETS. EIGHT (8) WATER VALVES, ONE (1) GAS VALVE, THREE (3) OVERHEAD UTILITY POLES, AND TWO (2) FIRE HYDRANTS WILL BE RESET. THERE ARE EXISTING CROSSWALKS, WITHIN THE PROJECT LIMITS AT SR 0772 (NEWPORT ROAD) AND SR 0023 ON THE WEST AND SOUTH SIDES OF THE INTERSECTION. THESE CROSSWALKS ARE PART OF THE PROJECT SIGNAL PERMIT AND WILL BE ADDRESSED BY THE TOWNSHIP, AS THE SIGNAL PERMITTEE. THERE IS AN EXISTING CROSSWALK OVER SR 0023 AT HILLCREST AVENUE THAT WILL BE UPGRADED AND ONE AT MAPLE AVENUE THAT IS PROPOSED. ADA RAMPS WILL BE INSTALLED ON THE SOUTH SIDE OF SR 0023 AT THESE INTERSECTIONS AS PART OF THIS PROJECT. ADDITIONALLY EAST-WEST CROSSWALKS AND ADA RAMPS WILL BE ADDED AT HILLCREST AVENUE, ETHEL AVENUE AND MAPLE AVENUE. | $1,284,453 |
| Department of Transportation | PROJECT TITLE: 2026 CENTRE HFST-LANE DEPARTURES :::: PROJECT DESCRIPTION: THE DESCRIPTION AND LOCATION OF THE PROJECT IS AS FOLLOWS: FOR THE IMPROVEMENT OF A CERTAIN SECTIONS OF STATE HIGHWAY IN CENTRE, CLEARFIELD, CLINTON, AND ELK COUNTIES, VARIOUS TOWNSHIPS AND BOROUGHS, COMMONWEALTH OF PENNSYLVANIA, GROUP 2-26-HFS. THIS WORK IS THE IMPROVEMENT OF VARIOUS STATE ROUTES INCLUDING APPLICATIONS OF HIGH FRICTION SURFACE TREATMENT, MILLING & OVERLAY, PAVEMENT MARKINGS, AND OTHER MISCELLANEOUS CONSTRUCTION, AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE. APPROXIMATE PROJECT LENGTH 19,450 FT (3.68 MILES). | $1,235,000 |
| Department of Transportation | PROJECT TITLE: ENV REV US F&WS :::: PROJECT DESCRIPTION: STATEWIDE FUNDING FOR ENVIRONMENTAL REVIEW FROM US FISH AND WILDLIFE SERVICE. | $1,215,911 |
| Department of Transportation | PROJECT TITLE: SR 1023 OVER EQUINUNK CREEK :::: PROJECT DESCRIPTION: BRIDGE REPLACEMENT ON STATE ROUTE 1023 (LORDVILLE ROAD) OVER EQUINUNK CREEK IN MANCHESTER TOWNSHIP, WAYNE COUNTY. | $1,169,115 |
| Department of Transportation | PROJECT TITLE: LINDEN STREET :::: PROJECT DESCRIPTION: HIGHWAY RESTORATION SR 3015 (LINDEN STREET) ELIZABETH AVE TO HIGHFIELD DR CITY OF BETHLEHEM AND BETHLEHEM TOWNSHIP NORTHAMPTON COUNTY | $1,123,345 |
| Department of Transportation | PROJECT TITLE: SR 997 CUMBERLAND HWY TRAFFIC SIGNAL :::: PROJECT DESCRIPTION: SR 997 (CUMBERLAND HIGHWAY) 2100 FEET SOUTH OF SMITH ROAD LETTERKENNY ARMY DEPOT IN GREENE TOWNSHIP, FRANKLIN COUNTY INSTALL A TRAFFIC SIGNAL | $1,100,000 |
| Department of Transportation | PROJECT TITLE: OLD RIVER ROAD BRIDGE :::: PROJECT DESCRIPTION: BRIDGE KEY 5446 - RURAL LOCAL OLD RIVER RD OVER ALLEGHENY CREEK ROBESON TOWNSHIP, BERKS COUNTY BRIDGE REHABILITATION **BRIDGE IS OWNED BY ROBESON TOWNSHIP | $1,002,744 |